When starting the main motor, first start the motor and gradually accelerate it to reach the specified speed before stabilizing; If it is necessary to slow down before standby maintenance; Dalian Plastic Blowing Film Machine
When heating, the temperature should not be too long or too high to prevent blockage of the material outlet; Those who have the conditions can apply fully automatic temperature control system software, set left and right dimensional tolerances, and ensure temperature stability, convenience, and safety;
After the server is turned on, closely monitor the operation status of the server, immediately adjust, adjust, instrument equipment, and control board, observe whether there are any abnormalities or damages, and provide maintenance and replacement to ensure its normal operation;
It is prohibited to operate the machine without material, and the server cannot be started when the temperature of the material cylinder, tee, and pipe is not reached as specified;
The air compression inside the bubble tube should be maintained in balance. During the entire traction process, the air compression leakage will be carried out, achieving an immediate filling effect.
Corona discharge CPU maintenance:
Clean high-voltage transformers, charging and discharging rollers, charging and discharging racks, electrical control cabinets, and adjust charging and discharging gaps on time;
Before starting up, check the humidity of the equipment environment to prevent short circuit faults in the charging and discharging racks, and check the operating temperature of the charging and discharging work roller bearings;
Immediately replace the silicone hose.
After the holiday, production and manufacturing workers return to repair one after another and carry out new daily production and manufacturing tasks. However, before starting up, the following inspection work must be done well:
Firstly, it is necessary to check the fastening condition of each connection position of the film blowing machine to avoid loosening of the anchor bolts;
The server gearbox and traction reducer should be frequently oiled, and the oil should be removed and replaced (the oil level should be at the marked position) to ensure normal operation of all rotating positions and avoid difficult operation and overheating damage;